Re ordering routes in my folder, is there a way?
-
Hi Folks,
Is there a way to re order routes in my folder. I seem to have them randomly scattered in there even after putting them there in the order I want. I`ve numbered them but would like them in order.Thanks!
Lee
-
@Lee-Hardwick You can not manually order them. You can sort the routes by any of the columns in the list, by clicking on the column header.
-
@Herko-ter-Horst Thanks for the reply, a bit disappointing that they can`t be moved in the order I want them such as Day1, Day2 etc
-
@Lee-Hardwick said in Re ordering routes in my folder, is there a way?:
@Herko-ter-Horst Thanks for the reply, a bit disappointing that they can`t be moved in the order I want them such as Day1, Day2 etc
Seems to me that you do a have a fair amount of control in their order by the naming convention you use and sorting on the names column. Plus... There are folders.
-
@Lee-Hardwick said in Re ordering routes in my folder, is there a way?:
@Herko-ter-Horst Thanks for the reply, a bit disappointing that they can`t be moved in the order I want them such as Day1, Day2 etc
As @Tim-Thompson has already said, considered naming of routes and the use of folders is the way to organise your routes.
I would also drop the word Day and number sequential routes as 01, 02, 03 etc. -
I use always MMDD Route Name (0326 Start season 2023)
-
@Lee-Hardwick said in Re ordering routes in my folder, is there a way?:
@Herko-ter-Horst Thanks for the reply, a bit disappointing that they can`t be moved in the order I want them such as Day1, Day2 etc
You can just prepend Day1, Day2, etc. to the name of your route and sort by name. Or use any of the date-based naming conventions suggested above.
I personally use a folder per year. Inside are folders for each of my trips, for which the name starts with "MMDD" for month and date. Inside each trip folder are routes for which the name starts with "MMDD (dow)", occasionally with a sequence number added if I use multiple routes per day, so "MMDD-1 (dow)" and "MMDD-2 (dow)". I just keep the lists/tables in MRA sorted by name.
-
Thanks for the ideas folks, I`ve had a play and numbered them day1,day 2 etc at the start of the description and its worked to get them in order with the name.
-
@Tim-Thompson I`ve used folders to group a multi day tour in